Project Description

Owner: SFP Pool Four Shopping Center
Date of Completion: September 2008
Scope of Work: Layout drawing into design/build with stamps per city requirements. Relocated 12-foot high, 80-foot pond, along with a 3 5/8 boarded wall to create a cost deduction within 30 days.